Extension of Existing Engineering STA

Read Instructions/FAQ before filling out form

FOR COMMISSION USE ONLY
FILE NO.

BESTA - 20100205ABI
Section I - General Information
1. Legal Name of the Applicant
CITADEL BROADCASTING COMPANY
Mailing Address
7201 W. LAKE MEAD BLVD.
SUITE 400

City
LAS VEGAS
State or Country (if foreign address)
NV
Zip Code
89128 -
Telephone Number (include area code)
7028045200
E-Mail Address (if available)
LICENSE.MANAGEMENT@CITCOMM.COM
FCC Registration No
0001595214
Call Sign
WNBF
Facility ID Number
72372
2. Contact Representative (if other than licensee/permittee)
CHRISTOPHER J. SOVA
Firm or Company Name
CITADEL BROADCASTING COMPANY
Mailing Address
4400 JENIFER STREET, NW
4TH FLOOR

City
WASHINGTON
State or Country (if foreign address)
DC
ZIP Code
20015 -
Telephone Number (include area code)
2028952325

E-Mail Address (if available)
CHRISTOPHER.SOVA@CITCOMM.COM
3. Purpose:
Engineering STA
Extension of Existing Engineering STA         File Number: BSTA - 20071023AAB
Legal STA
Extension of Existing Legal STA         
4. Service: AM 
5. Community of License:
City: BINGHAMTON     State: NY
6. If this application has been submitted without a fee, indicate reason for fee exemption (see 47 C.F.R. Section 1.1114):
Governmental Entity Noncommercial Educational Licensee/Permittee Other
N/A (Fee Required)
7. Environmental Protection Act.    The proposed facility is excluded from environmental processing under 47. C.F.R. Section 1.1306 (i.e., The facility will not have a significant environmental impact and complies with the maximum permissible radiofrequency electromagnetic exposure limits for controlled and uncontrolled environments). Unless the applicant can determine compliance through the use of the RF worksheets in Appendix A, an Exhibit is required.

By checking "Yes" above, the applicant also certifies that it, in coordination with other users of the site, will reduce power or cease operation as necessary to protect persons having access to the site, tower or antenna from radiofrequency electromagnetic exposure in excess of FCC guidelines.
Yes No

See Explanation in
[Exhibit 33]

8.
Please explain in detail the "extraordinary circumstances" which warrant temporary operations at variance from the Commission's Rules. In addition, please specify 1)the specific rules and/or policies from which the applicant seeks temporary relief; 2) how the public interest will be furthered by grant; and 3) the expected duration of the STA and the licensee's plan for restoration of licensed operation. If requesting variance with other than authorized technical facilities, please specify the exact facilities sought.
[Exhibit 34]
9.
Anti-Drug Abuse Act Certification. Applicant certifies that neither applicant nor any party to the application is subject to denial of federal benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862.
Yes No

I hereby certify that the statements in this application are true, complete, and correct to the best of my knowledge and belief, and are made in good faith. I acknowledge that all certifications and attached Exhibits are considered material representations.

Typed or Printed Name of Person Signing
MARTIN STABBERT
Typed or Printed Title of Person Signing
DIRECTOR OF CORPORATE ENGINEERING
Signature
Date (mm/dd/yyyy)
02/05/2010

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1)), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503).



Exhibits
Exhibit 34
Description:
BASIS FOR STA EXTENSION REQUEST

SUBSTANTIAL PROGRESS HAS BEEN MADE TOWARDS RESTORING OPERATION OF WNBF TO LICENSED PARAMETERS. SINCE THE LAST STA EXTENSION WAS GRANTED, ADJUSTMENTS WERE MADE TO THE ANTENNA TUNING UNITS TO ENSURE PROPER MATCHING OF THE NETWORKS TO THE TRANSMISSION LINE. A NUMBER OF ADJUSTMENTS WERE MADE TO THE PHASE AND LOOP PARAMETERS WITH EACH CHANGE FOLLOWED UP WITH FIELD MEASUREMENTS ALONG THE MONITORED RADIALS. ONCE THE ARRAY WAS IN A SATISFACTORY ADJUSTMENT, FINAL MEASUREMENTS WERE TAKEN ALONG THE MONITORED RADIALS AND TABULATED IN THE PARTIAL PROOF PRESENTLY SUBMITTED. TOWER IMPEDANCES AND BASE CURRENTS WERE ALSO TAKEN AND RECORDED. ON FEBRUARY 1, 2010, AN APPLICATION REQUESTING DIRECT MEASUREMENT OF POWER (FCC FILE NO. BZ-20100201AHN)WAS FILED. UPON GRANT OF THE DIRECT MEASUREMENT APPLICATION, THE STA WILL NO LONGER BE NECESSARY AND WILL BE SUBMITTED FOR CANCELLATION.

Attachment 34