1. Legal Name of the Applicant 
KENTUCKY WESLEYAN COLLEGE
Mailing Address
3000 FREDERICA STREET
City
OWENSBORO
State or Country (if foreign address)
KY
ZIP Code
42301 -
Telephone Number (include area code)
2708523596
E-Mail Address (if available) 
PAMGR@KWC.EDU
FCC Registration Number:
0006868194
Call Sign 
WKWC
Facility Identifier 
34259
2. Contact Representative (if other than Applicant)

Firm or Company Name

Telephone Number (include area code)

E-Mail Address (if available)

3. If this application has been submitted without a fee, indicate reason for fee exemption (see 47 C.F.R. Section 1.1114):
Governmental Entity Noncommercial Educational Licensee/Permittee Other
N/A (Fee Required)
4. Facility Information:
a.  Commercial Noncommercial
b.  Directional Nondirectional
c.   Community of License:
City: OWENSBORO State: KY
5. Program Test Authority:
  Requesting program test authority.
  Station operating pursuant to automatic program test authority (47 C.F.R. Section 73.1620(a)(1)).
6. Purpose of Application:
Cover construction permit (list most recent construction permit file number -- starts with the prefix BPH, BNPH, BMPH, BPED, BMPED, or BMPED): BPED-19981013IA
Modify an authorized license (list license file number -- starts with the prefix BLH, BMLH, BLED, or BMLED): -
Amend a pending application
If an amendment, submit as an Exhibit a listing by Section and Question Number the portions of the pending application that are being revised.
[Exhibit 1]



NOTE: In addition to the information called for in this section, an explanatory exhibit providing full particulars must be submitted for each question for which a "No" response is provided.

Section II - Legal and Financial

1. Certification. Applicant certifies that it has answered each question in this application based on its review of the application instructions and worksheets. Applicant further certifies that where it has made an affirmative certification below, this certification constitutes its representation that the application satisfies each of the pertinent standards and criteria set forth in the application instructions and worksheets. Yes No
2. Licensee/Permittee certifies that all terms, conditions, and obligations set forth in the underlying construction permit have been fully met. Yes No
See Explanation in
[Exhibit 2]
3. Licensee/Permittee certifies that, apart from changes already reported, no cause or circumstance has arisen since the grant of the underlying construction permit which would result in any statement or representation contained in the construction permit application to be now incorrect. Yes No
See Explanation in
[Exhibit 3]
4. Character Issues. Applicant certifies that neither licensee/permittee nor any party to the application has or has had any interest in, or connection with:

a. any broadcast application in any proceeding where character issues were left unresolved or were resolved adversely against the applicant or party to the application; or
b. any pending broadcast application in which character issues have been raised.
Yes No
See Explanation in
[Exhibit 4]
5. Adverse Findings. Applicant certifies that, with respect to the applicant and any party to the application, no adverse finding has been made, nor has an adverse final action been taken related to the following: any felony; mass media-related antitrust or unfair competition; fraudulent statements to another governmental unit; or discrimination. Yes No
See Explanation in
[Exhibit 5]
6. Anti-Drug Abuse Act Certification. Applicant certifies that neither licensee/permittee nor any party to the application is subject to denial of federal benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862. Yes No

I certify that the statements in this application are true, complete, and correct to the best of my knowledge and belief, and are made in good faith. I acknowledge that all certifications and attached Exhibits are considered material representations. I hereby waive any claim to the use of any particular frequency as against the regulatory power of the United States because of the previous use of the same, whether by license or otherwise, and request an authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.)

Typed or Printed Name of Person Signing
DR. PAMELA J. GRAY
Typed or Printed Title of Person Signing
STATION MANAGER
Signature
Date
06/02/2002



SECTION III - PREPARER'S CERTIFICATION

I certify that I have prepared Section III (Engineering data) on behalf of the applicant, and that after such preparation, I have examined and found it to be accurate and true to the best of my knowledge and belief.

Name
Relationship to Applicant (e.g., Consulting Engineer)
CONTRACT ENGINEER
Signature
Date
06/02/2002
Mailing Address

City
State or Country (if foreign address)
Zip Code
-
Telephone Number (include area code)
E-Mail Address (if available)

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1)), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503).





Section III - Engineering
TECHNICAL SPECIFICATIONS
Ensure that the specifications below are accurate. Contradicting data found elsewhere in this application will be disregarded. All items must be completed. The response "on file" is not acceptable.
TECH BOX
1. Channel: 212
2.
a. Effective Radiated Power: 5 kW(H)   5 kW(V)
b. Maximum Effective Radiated Power:
    (Beam-Tilt Antenna ONLY) Not Applicable
kW(H)   kW(V)
3. Transmitter Power Output: 2.5 kW
4. Antenna Data

Manufacturer
HAR
Model
HARSKM-4E, four sections
Number of Sections
4
Spacing Between Sections (wavelength)
1
NOTE: In addition to the information called for in this section, an explanatory exhibit providing full particulars must be submitted for each question for which a "No" response is provided.

CERTIFICATION

All applicants must complete this section.

5. Main Studio Location.    The main studio location complies with 47 C.F.R. Section 73.1125. Yes No

See Explanation in
[Exhibit 6]

6. Transmitter Power Output.     The operating transmitter power output produces the authorized effective radiated power. Yes No

See Explanation in
[Exhibit 7]

APPLICATIONS FILED TO COVER A CONSTRUCTION PERMIT.
Only applicants filing this application to cover a construction permit must complete the following section.
NOTE: In addition to the information called for in this section, an explanatory exhibit providing full particulars must be submitted for each question for which a "No" response is provided.
7. Constructed Facility .    The facility was constructed as authorized in the underlying construction permit or complies with 47 C.F.R. Section 73.1690. Yes No

See Explanation in
[Exhibit 8]

8. Special Operating Conditions.    The facility was constructed in compliance with all special operating conditions, terms, and obligations described in the construction permit.
Yes No

See Explanation in
[Exhibit 9]

  An exhibit may be required.    Review the underlying construction permit. [Exhibit 10]
APPLICATIONS FILED PURSUANT TO 47 C.F.R. SECTIONS 73.1675(c) or 73.1690(c).
Only applicants filing this application pursuant to 47 C.F.R. Sections 73.1675(c) or 73.1690(c) must complete the following section.
9. Changing transmitter power output.     Is this application being filed to authorize a change in transmitter power output caused by the replacement of omnidirectional antenna with another omnidirectional antenna or an alteration of the transmission line system? See 47 C.F.R. Sections 73.1690(c)(1) and (c)(10). Yes No
10. Increasing effective radiated power.     Is this application being filed to authorize an increase in ERP for a station operating in the nonreserved band (Channels 221-300)? See 47 C.F.R. Sections 73.1690(c)(4), (c)(5) and (c)(7).

If "Yes" to the above, the applicant certifies the following:

Yes No
a. Spacing Requirements. The increase in ERP was authorized pursuant to MM Docket 88-375 (Class A stations) OR the facility complies with the spacing requirements of 47 C.F.R. Section 73.207.
Yes No

See Explanation in
[Exhibit 11]

b. International Coordination. The transmitter site is greater than 320 km from the Canadian or Mexican borders OR coordination for the station's international class is complete.
Yes No

See Explanation in
[Exhibit 12]

c. Interference. The requirements of 47 C.F.R. Section 73.1030 regarding notification to radio astronomy installations, radio receiving installations and FCC monitoring stations have either been satisfied OR are not applicable.
Yes No

See Explanation in
[Exhibit 13]

Exhibit required. If the proposed facility must be notified to the entities set forth in 47 C.F.R. Section 73.1030, the applicant must provide a copy of the written approval for the ERP increase from the affected entity.

[Exhibit 14]
d. Multiple Ownership Showing. The increase in ERP will not require the consideration of a multiple ownership showing pursuant to 47 C.F.R. Section 73.3555.
Yes No

See Explanation in
[Exhibit 15]

e. Environmental Protection Act. The proposed facility is excluded from environmental processing under 47 C.F.R. Section 1.1306 (i.e., the facility will not have a significant environmental impact and complies with the maximum permissible radiofrequency electromagnetic exposure limits for controlled and uncontrolled environments). Unless the applicant can determine compliance through the use of the RF worksheets in Appendix A, an Exhibit is required.
Yes No

See Explanation in
[Exhibit 16]

   By checking "Yes" above, the applicant also certifies that it, in coordination with other users of the site, will reduce power or cease operation as necessary to protect persons having access to the site, tower or antenna from radiofrequency electromagnetic exposure in excess of FCC guidelines.
 
11. Increasing vertically polarized effective radiated power.     Is this application being filed pursuant to 47 C.F.R. Section 73.1690(c)(4) to authorize an increase in the vertically polarized ERP for a station operating in the reserved band (Channels 200-220)?

If "Yes" to the above, the applicant certifies the following:

Yes No
a. TV Channel 6 Protection Requirements. The facility complies with the spacing requirements of 47 C.F.R. Section 73.525(a)(1).
Yes No

See Explanation in
[Exhibit 17]

b. Environmental Protection Act. The proposed facility is excluded from environmental processing under 47 C.F.R. Section 1.1 306 (i.e., the facility will not have a significant environmental impact and complies with the maximum permissible radiofrequency electromagnetic exposure limits for controlled and u ncontrolled environments). Unless the applicant can determine compliance through the use o f the RF worksheets in Appendix A, an Exhibit is required.
Yes No

See Explanation in
[Exhibit 18]

By checking "Yes" above, the applicant also certifies that it, in coordination with other users of the site, will reduce power or cease operation as necessary to protect persons having access to the site, tower or antenna from radiofrequency electromagnetic exposure in excess of FCC guidelines.

 
12. Decreasing effective radiated power (non-reserved channel).     Is this application being filed pursuant to 47 C.F.R. Section 73.1690(c)(8) to authorize a decrease in the ERP for a station operating in the nonreserved band (Channels 221-300)?

If "Yes" to the above, the applicant certifies the following:

Yes No
a. Community Coverage . The proposed facility complies with the community coverage requirements of 47 C.F.R. Section 73.315 where the distance to the 3.16 mV/m contour is predicted using the standard prediction method in 47 C.F.R. Section 73.313.

Yes No

See Explanation in
[Exhibit 19]

b. Auxiliary Facilities. The authorized or pending auxiliary facilities for this station comply with 47 C.F.R. Section 73.1675(a).
Yes No

See Explanation in
[Exhibit 20]

c. Multiple Ownership Showing. The decrease in ERP is not requested or required to establish compliance with 47 C.F.R. Section 73.3555.
Yes No

See Explanation in
[Exhibit 21]

13. Decreasing effective radiated power (reserved channel).     Is this application being filed pursuant to 47 C.F.R. Section 73.1690(c)(8) to authorize a decrease in the ERP for a station operating in the reserved band (Channels 200-220)?

If "Yes" to the above, the applicant certifies the following:

Yes No
a. Community Coverage . The proposed facility complies with the community coverage requirements of 47 C.F.R. Section 73.1690(c)(8)(i) where the distance to the 1 mV/m contour is predicted using the standard prediction method in 47 C.F.R. Section 73.313.

Yes No

See Explanation in
[Exhibit 22]

b. Auxiliary Facilities. The authorized or pending auxiliary facilities for this station comply with 47 C.F.R. Section 73.1675(a).
Yes No

See Explanation in
[Exhibit 23]

14. Replacing a directional antenna.     Is this application being filed pursuant to 47 C.F.R. Section 73.1690(c)(2) to replace a directional antenna with another directional antenna?

If "Yes" to the above, the applicant certifies the following:

Yes No
a. Measurement of Directional Antenna. The composite measured pattern and measurement procedures comply with 47 C.F.R. Section 73.1690(c)(2). Exhibit required.
Yes No
See Explanation in
[Exhibit 24]

[Exhibit 25]

b. Installation of Directional Antenna. The installation of the directional antenna complies with 47 C.F.R. Section 73.1690(c)(2). Exhibit required.
Yes No
See Explanation in
[Exhibit 26]

[Exhibit 27]

15. Deleting contour protection status.     Is this application being filed pursuant to 47 C.F.R. Section 73.1690(c)(6) to delete contour protection status (47 C.F.R. Section 73.215) for a station operating in the nonreserved band (Channels 221-300)? Yes No
If "Yes" to the above, the applicant certifies that the facility complies with the spacing requirements of 47 C.F.R. Section 73.207. Yes No

See Explanation in
[Exhibit 28]

16. Use a formerly licensed main facility as an auxiliary facility.     Is this application being filed pursuant to 47 C.F.R. Section 73.1675(c)(1) to request authorization to use a formerly licensed main facility as an auxiliary facility and/or change the ERP of the proposed auxiliary facility?

If "Yes" to the above, the applicant certifies the following:

Yes No
a. Auxiliary antenna service area. The proposed auxiliary facility complies with 47 C.F.R. Section 73.1675(a).

Yes No

See Explanation in
[Exhibit 29]

b. Environmental Protection Act. The proposed facility is excluded from environmental processing under 47 C.F.R. Section 1.1 306 (i.e., the facility will not have a significant environmental impact and complies with the maximum permissible radiofrequency electromagnetic exposure limits for controlled and uncontrolled environments). Unless the applicant can determine compliance through the use of the RF worksheets in Appendix A, an Exhibit is required.
Yes No

See Explanation in
[Exhibit 30]

   By checking "Yes" above, the applicant also certifies that it, in coordination with other users of the site, will reduce power or cease operation as necessary to protect persons having access to the site, tower or antenna from radiofrequency electromagnetic exposure in excess of FCC guidelines.
 
17. Change the license status. Is this application being filed pursuant to 47 C.F.R. Section 73.1690(c)(9) to change the license status from commercial to noncommercial or from noncommercial to commercial?


Yes No

If "Yes" to the above, submit an exhibit providing full particulars. For applications changing license status from commercial to noncommercial, include Section II of FCC Form 340 as an exhibit to this application.

[Exhibit 31]

PREPARERS CERIFICATION ON PAGE 3 MUST BE COMPLETED AND SIGNED.



Exhibits
Exhibit 2
Description:
REVISION OF EXHIBIT A & EXHIBIT 2 OF APRIL 9, 2002 APPLICATION

APRIL 9, 2002

EXHIBIT A.

ACCORDING TO THE TERMS SET FORTH IN THE CONSTRUCTION PERMIT, WKWC STILL NEEDS TO COMPLETE A SECOND SET OF FIELD STRENGTH MEASUREMENTS BEFORE PROGRAM TEST AUTHORITY CAN TAKE PLACE. THESE MEASUREMENTS ARE IN THE PROCESS OF BEING COMPLETED AND WILL BE FINISHED BY THE FIRST OF MAY, 2002. THERE ARE A NUMBER OF CIRCUMSTANCES THAT HAVE PREVENTED WKWC FROM COMPLETING THESE TESTS.

IN THE SPRING OF 1999, WKWC-FM, THE PUBLIC RADIO SERVICE OF KENTUCKY WESLEYAN COLLEGE, APPLIED FOR A CONSTRUCTION PERMIT TO RELOCATE THE TRANSMITTER AND TOWER TO A NEW SITE ON THE CAMPUS. THE CONSTRUCTION PERMIT WAS APPROVED IN APRIL 1999 WITH THE STIPULATION THAT MEASUREMENTS BE MADE TO ASSURE THE RELOCATION OF THE TOWER WOULD NOT INTERFERE WITH THE TRANSMISSION OF WOMI-AM LOCATED ACROSS THE STREET FROM CAMPUS. DURING THE SUMMER AND FALL FIELD STRENGTH MEASUREMENT WERE TAKEN BEFORE THE TOWER WAS RELOCATED. DUE TO SCHEDULING CONFLICTS AND WEATHER PROBLEMS THE TOWER WAS NOT SCHEDULED TO BE MOVED UNTIL DECEMBER 11, 1999.

BEFORE THE MOVE COULD BE MADE, THE TRANSMITTER BLEW A CAPACITOR AND WHEN OFF THE AIR ON THURSDAY, DECEMBER 2, 1999. THE CONTRACT ENGINEER WAS CONTACTED AND COULD NOT WORK ON THE PROBLEM UNTIL FRIDAY DECEMBER 3, 1999. REPLACEMENT PARTS WERE ORDERED LATER THAT DAY, BUT WERE NOT SHIPPED UNTIL MONDAY AND WERE NOT RECEIVED UNTIL WEDNESDAY. THE WRONG PART WAS SENT, SO THE TRANSMITTER WAS NOT REPAIRED BUT THE ENGINEER WAS INSTRUCTED BY THE TRANSMITTER MANUFACTURER ON HOW TO TEST THE TRANSMITTER TO MAKE SURE IT WAS OPERATIONAL. ON THURSDAY DECEMBER 9, 1999, THE TRANSMITTER WAS MOVED TO THE NEW LOCATION.

ON SATURDAY, DECEMBER 11, 1999, THE TOWER WAS DISASSEMBLED, MOVED TO THE NEW SITE, AND REASSEMBLED. AT THIS TIME, THE TRANSMISSION LINE WAS CONNECTED AND RUN INTO THE BUILDING. DURING THE WEEK OF DECEMBER 13, THE ELECTRICAL SERVICE WAS SET UP FOR THE TRANSMITTER. THE NEXT WEEK, THE METAL WORK WAS COMPLETED FOR THE PROPER VENTILATION OF THE TRANSMITTER.

BECAUSE THE CONTRACT ENGINEER SERVES SEVERAL OTHER STATIONS, HE COULD NOT FINISH HOOKING UP THE TRANSMITTER UNTIL DECEMBER 31, 1999. AT THAT TIME, HE WAS UNABLE TO BRING THE TRANSMITTER ON LINE AND WAS SCHEDULED TO RETURN ON TUESDAY JANUARY 4, 2000 TO COMPLETE THE JOB. UNFORTUNATELY, AT 4:05 P. M. ON MONDAY JANUARY 3, 2000 AT TORNADO HIT OWENSBORO AND KNOCKED THE TOWER DOWN AND DESTROYED THE ANTENNA. ALTHOUGH THE TRANSMITTER WAS UNHARMED, THE TOWER, ANTENNA AND THE TRANSMISSION LINE WERE A TOTAL LOSS.

THE CAMPUS WAS ALSO VERY HARD HIT WITH AN ESTIMATED $5 MILLION IN DAMAGES. THE TORNADO OCCURRED ONE WEEK BEFORE CLASSES WERE TO RESUME IN THE SPRING. THE MAIN CONCERN ON CAMPUS WAS STUDENT SAFETY AND TO MEET THE NEEDS OF THE INCOMING STUDENTS. AS A RESULT, ANY REPLACEMENT OF THE RADIO TOWER WAS DELAYED. BECAUSE OF CONFLICTS WITH THE INSURANCE COMPANY, THE SITE WAS NOT INSPECTED UNTIL JANUARY 28, 2000. THE INSURANCE WAS NOT SETTLED UNTIL JUNE, 2000.

A NEW TOWER AND ANTENNA (HARRIS SKM-4E IS THE REPLACEMENT OF THE FLM 4-E) WERE ORDERED, DELIVERED AND ERECTED DURING THE SUMMER OF 2000. IN AUGUST 2000, THE TRANSMITTER WAS HOOKED UP AND REPAIRS WERE NECESSARY TO MAKE IT OPERATIONAL. THE STATION RETURNED TO THE AIR ON AUGUST 22, 2000. THE REQUEST FOR PROGRAM AUTHORITY WAS NOT REQUESTED AT THAT TIME BECAUSE THE CONTRACT ENGINEER IN EFFECT, QUIT SERVICING THE STATION, BUT DID NOT INFORM THE MANAGEMENT THAT PROGRAM TEST AUTHORITY WAS REQUIRED FOR OPERATION. AFTER OVER A YEAR OF CONTACTING THE ENGINEER, HE FINALLY SUGGESTED ANOTHER CONTRACT ENGINEER TO COMPLETE THE CONSTRUCTION PERMIT. AGAIN, THIS ENGINEER DID NOT TAKE THE NECESSARY STEPS TO COMPLETE THE CONSTRUCTION PERMIT. THIS TOOK ANOTHER YEAR TO SORT OUT THESE PROBLEMS.

THE CURRENT CONTRACT ENGINEER CONTACTED BRIAN BUTLER ON THE FCC MASS MEDIA DIVISION ABOUT THE PROPER PROCEDURE TO MAKE THE STATION COMPLIANT. HE INSTRUCTED THE STATION MANAGEMENT TO FILE THE FCC 302-FM REQUEST FOR OPERATION IMMEDIATELY AND TO COMPLETE THE FIELD STRENGTH MEASUREMENTS AS SOON AS POSSIBLE. THE LOCAL AM, WOMI, HAS BEEN CONTACTED ABOUT THE SITUATION AND IS WORKING WITH US TO COMPLETE THE PROCESS.

EXHIBIT #2
JUNE 2, 2002

MONITOR POINTS FOR WOMI-AM
TRANSMITTER POWER 833 WATTS
EQUIPMENT USED FOR MONITOR POINTS-POTOMAC TYPE FIM-41

WKWC-FM OWENSBORO FILED AN APPLICATION TO MOVE ITS TOWER IN 1999. IN PURSUANT TO SEC. 73.1692, WKWC PERFORMED A SET OF MONITOR POINTS FOR WOMI-AM. THIS WAS TO ENSURE THE RELOCATION OF THE TOWER WOULD NOT AFFECT THE RADIATION PATTERN OF WOMI-AM.   TEN POINTS ALONG EIGHT RADIALS FROM WOMI-AM'S TOWER WERE MEASURED BEFORE AND AFTER THE RELOCATION OF WKWC TOWER. THE FIRST SET MONITOR POINTS WERE PERFORMED BETWEEN AUGUST AND OCTOBER OF 1999. THE SECOND SET OF MONITOR POINTS WERE PERFORMED IN MAY 2002. THE LONG LAPSE OF DATES BETWEEN THE FIRST AND SECOND SET OF MONITOR POINTS IS DUE TO CIRCUMSTANCES DISCUSSED IN A LETTER TO THE FCC ON APRIL 9, 2002. THIS WAS FILED WITH FORM FCC-302FM. THE DIFFERENCE BETWEEN THE 1999 MONITOR POINTS AND THE 2002 MONITOR POINTS IS -1.54 PERCENT. AFTER CONSULTING WITH THE CHIEF ENGINEER OF WOMI, WE'VE DETERMINED THE MOVEMENT OF WKWC-FM'S TOWER OVERALL HAD LITTLE IF ANY EFFECT ON THE RADIATION PATTERN OF WOMI-AM. THUS A TOWER DETUNING KIT ISN'T NECESSARY.

ROB CALHOUN


WOMI MONITOR POINTS FOR THE O RADIAL

DATEDATECHANGE
POINTDISTANCE8/3/995/23/02
1.5KM.3 VOLTS.31VOLTS3.3
2.7KM.21VOLTS.21VOLTS0
31.5KM.9V.95V5.5
42KM52MV50MV-3.9
53KM32MV31MV-3.2
64KM27MV26MV-3.8
75KMNANA
87KM19MV18MV-5.3
910KM8.7MV8.6MV-1.2
1015KMNANA
-1.08%

WOMI MONITOR POINTS FOR THE 45 RADIAL
8/6/995/24/02
1.5KM.25V.24V-4
2.7KM.178V.174V-2.3
31.5KM40MV.41MV2.5
42KM42MV.39MV-7.2
53KM23.4MV22.1MV-5.6
64KM16.8MV17MV1.2
75KMNANA
87KM8.2MV8MV-2.5
910KM2.3MV2.2MV-4.4
1015KM1.36MV1.4MV2.9
-2.15%

WOMI MONITOR POINTS FOR THE 90 RADIAL
8/22/995/25/02
1.5KM.26V.26V0
2.7KM.23V.22V-5
31.5KM.1V.1V0
42KM82MV80MV-2.5
53KM50MV48MV-4
64KM47MV45MV-4.3
75KM22MV24MV8
87KM13MV10MV-8
910KM1MV.95MV-5
1015KM.93MV.91MV-2.2
-2.30%

WOMI MONITOR POINTS FOR THE 135 RADIAL
DATEDATECHANGE
POINTDISTANCE8/5/995/26/02
1.5KM.44V.42V-4.6
2.7KM.39V.38V-2.6
31.5KM102MV100MV-2
42KM100MV103MV3
53KM62MV61MV-2.7
64KM38MV36MV-5.3
75KMNANA
87KM6.8MV7MV2.9
910KM5.2MV5.20
1015KM2.8MV2.7MV-3.6
-1.65%

WOMI MONITOR POINTS FOR THE 180 RADIAL
9/29/995/27/02
1.5KM.46V.45V2.2
2.7KM.24V.22V-8.4
31.5KM.147V.147V0
42KM94MV92MV-2.4
53KM70MV71MV1.4
64KM42MV41MV-2.4
75KM28MV26MV-7.3
87KM13.8MV13MV-5.8
910KM9.4MV9.3MV-1.1
1015KM4.4MV4.5MV2.2
-2.16%

WOMI MONITOR POINTS FOR THE 225 RADIAL
9/30/995/28/02
1.5KM.46V.44V-4.4
2.7KM.42V.41V-2.4
31.5KM.27V.28V3.6
42KM103MV100MV-3
53KM58MV60MV3.4
64KM38MV36MV-6.3
75KM33MV31MV-6.1
87KMNANA0
910KM11MV12MV8.4
1015KM3.6MV3.2MV-8.4
-1.68%


WOMI MONITOR POINTS FOR THE 270 RADIAL
DATEDATECHANGE
POINTDISTANCE9/30/995/29/02
1.5KM.45V045V0
2.7KM.35V.33V-5.5
31.5KM.2V.18V-5
42KM100MV103MV3
53KM65MV66MV1.5
64KM40MV39MV-2.5
75KM30MV28MV-6.7
87KM15MV16MV6.3
910KM11MV10MV-1
1015KM4MV5MV1.25
-0.90%

WOMI MONITOR POINTS FOR THE 315 RADIAL
10/1/995/30/02
1.5KM.39V.40V2.5
2.7KM.28V.27V-3.6
31.5KM.17V.16V-5.9
42KM104MV101MV3
53KM63MV62MV-1.6
64KM40MV41MV2.5
75KM35MV36MV2.8
87KM14MV13MV-7.2
910KM10MV11MV1
1015KM5MV4MV2.5
-0.40%


















Attachment 2