DTV TRANSITION STATUS REPORT

PLEASE READ INSTRUCTIONS BEFORE COMPLETING THIS FORM

FOR COMMISSION USE ONLY
FILE NO.

BDTRET - 20080213AGO

NOTE: Each Licensee/Permittee is responsible for the continuing accuracy and completeness of the information furnished in this Form. Each Licensee/Permittee must update this Form, as necessary, until such Licensee/Permittee reports the completion of its transition (i.e., that it has begun operating its full, authorized facility as defined in the post-transition DTV Table, 47 C.F.R. 73.622(i), and accompanying Appendix B).

SECTION I - GENERAL INFORMATION

Licensee/Permittee Information
1. Legal Name of the Licensee/Permittee
PRAIRIE PUBLIC BROADCASTING, INC.
Mailing Address
PO BOX 3240

City
FARGO
State or Country (if foreign address)
ND
ZIP Code
58108 - 3240
Telephone Number (include area code)
7012416900
E-Mail Address (if available) 
JANDERSON@PRAIRIEPUBLIC.ORG
Contact Information (if different from licensee/permittee)
2. Contact Representative
MARGARET L. MILLER, ESQ.
Firm or Company Name

Mailing Address
1200 NEW HAMPSHIRE AVENUE, N.W.
SUITE 800

City
WASHINGTON
State or Country (if foreign address)
DC
ZIP Code
20036 - 6802
Telephone Number (include area code)
2027762000
E-Mail Address (if available) 
MMILLER@DOWLOHNES.COM
Station / Facility Information
3. FCC Registration Number
0002476091
Call Sign 
KFME
Facility ID Number
53321
Community of License: City
FARGO

State
ND

Network Affiliation (if applicable)
PBS
Satellite?
Yes   No
Purpose of Form:
4.
a. Status Report
b. Update     
c. Amendment
If an amendment, submit as an Exhibit a listing by Section and Question Number the portions of the pending application that are being revised. [Exhibit 1]

SECTION II - CURRENT STATUS

1.
Currently Assigned Channels:
a. NTSC Channel: 13 
b. Post-Transition DTV Channel:  13
c. Pre-Transition DTV Channel (if different from Post-Transition channel.) 23
2.
Relevant FCC File No. for Post-Transition Authorization, if on file with Commission (or indicate "Not Yet Filed"):
FCC File No. - Not Yet Filed
3.
Current Construction Deadline: 02/17/2009




SECTION III - POST-TRANSITION FACILITY (Complete all items unless otherwise indicated.)

1. Operational Status:
Is the Licensee/Permittee now operating its fully authorized final, DTV (post-transition) facility?
Yes No     (If YES, go to Section V; If NO, go to Item 2.)

2. If Item 1 is NO (i.e., not fully operational), then indicate operational status of final, DTV (post-transition) facility and indicate date Licensee/Permittee expects to begin full, authorized post-transition operations: (check one)
(i)
Licensee/Permittee is operating its post-transition facility pursuant to program test authority; see 47 C.F.R. § 73.1620(a). If checked, indicate date Licensee/Permittee expects to file its license to cover (FCC Form 302) application. Expected Operational Date:
(mm/dd/yyyy)
(ii)
Licensee/Permittee is operating its post-transition facility pursuant to special temporary authority (STA) or at a reduced facility. If checked, indicate power level and percentage of analog population covered by reduced facility. Power Level
 kW
Population:
 %
(iii)
Licensee/Permittee is not operating its post-transition facility.
3. Construction Status:
Has the Licensee/Permittee completed construction of its final, DTV (post-transition) facility?
Yes No     (If YES, skip Items 4-5 and go to Item 6(a); If NO, go to Item 4.)

4. If Item 3 is NO (i.e., not fully constructed), then indicate construction status of final, DTV (post-transition) facility and indicate date Licensee/Permittee expects to complete construction: (check all that apply)
(i) Licensee/Permittee has not begun construction of its post-transition facility. Expected Construction Date:
02/17/2009
(mm/dd/yyyy)
(ii) Licensee/Permittee is now constructing its post-transition facility.
(iii) Licensee/Permittee has constructed a reduced post-transition facility and additional construction is needed to complete Licensee/Permittee's fully authorized facility.
5. Construction Permit Status:
Does the Licensee/Permittee hold a license or construction permit for its final, DTV (post-transition) facility?
Yes No     (If YES, go to Item 6(a); If NO, skip Item 6(a) and go to Item 6(b).)

6.
a. Does the Licensee/Permittee need to modify its license or construction permit in order to match the post-transition facilities defined for the Licensee/Permittee in the new DTV Table of Allotments, 47 C.F.R. § 73.622(i), as adopted in the Seventh Report and Order in MB Docket No. 87-268?
Yes No     (If YES, go to 6(b); If NO, skip Item 6(b) and go to Section IV.)

b. Has the Licensee/Permittee filed an application for a new or modified construction permit for its final, DTV (post-transition) facility? (If YES, indicate relevant FCC File No. and date filed; If NO, indicate date Licensee/Permittee expects to file such application.) (NOTE: To qualify for expedited processing, the Licensee/Permittee must file its application within 45 days of the effective date of the Report and Order in the Third DTV Periodic Review proceeding, MB Docket No. 07-91, as well as meet other criteria established in that proceeding.)
Yes
FCC File No.
- Filing Date: (mm/dd/yyyy)
No
Expected Filing Date:
03/17/2008 (mm/dd/yyyy)

SECTION IV -- ADDITIONAL STEPS NEEDED TO COMPLETE CONSTRUCTION (For Licensees/Permittees that are not fully constructed or operational.)

At present, Licensee/Permittee has the following needs that must be addressed before it can fully construct and/or operate its final, DTV (post-transition) facility: (check all that apply and for all checked responses, describe issue and estimate date of resolution. If necessary, provide an explanation or attach an Exhibit). [Exhibit 2]
(1) Licensee/Permittee needs to obtain FCC action on a pending application. (If checked, indicate date filed and relevant FCC File No.)
FCC File No. -

Date filed: (mm/dd/yyyy)

(2) Licensee/Permittee needs to obtain international government clearance for its post-transition facility.
(3) Licensee/Permittee needs to obtain FAA approval for its post-transition facility.
(4) Licensee/Permittee needs to obtain state or local governmental approval (e.g., zoning) for its post-transition facility.
(5) Licensee/Permittee needs to obtain, adjust and/or install equipment for its post-transition facility. (If checked, specify need below and indicate when equipment was ordered and expected delivery date.)
(1) New antenna.
(2) Adjust or install antenna (except for side-mount issue).
(3) Switch side-mounted DTV antenna with top-mounted analog antenna.
(4) New transmitter.
(5) Adjust or install transmitter.
(6) General installation of equipment requiring hiring of a tower crew.
(7) Other equipment needs. (If checked, specify.)
(6)
Licensee/Permittee needs to change its tower location or construct a new tower.
(7) Licensee/Permittee needs to coordinate its transition with other broadcast stations. (If checked, specify Call Signs of those other stations.)
(8) Licensee/Permittee has other needs that must be addressed before it can fully construct and operate its post-transition facility. (If checked, explain.)

SECTION V -- ANALOG SERVICE

Status of Analog Service. (Check one.) If necessary, provide an explanation or attach an Exhibit. Note: Full-power television broadcast stations must cease broadcasting in analog as of the transition date (i.e., June 12, 2009), as required by statute; see 47 U.S.C. § 309(j)(14). [Exhibit 3]
(1) Licensee/Permittee will continue to provide full, authorized analog service until the transition date.
(2) Licensee/Permittee has obtained FCC approval to reduce its analog service prior to the transition date. If checked, indicate relevant FCC File No., date reduced service will begin, power level and percentage of population covered by Licensee/Permittee's analog service.
(3) Licensee/Permittee has obtained FCC approval to terminate its analog service prior to the transition date. If checked, indicate relevant FCC File No. and date service will cease.
(4) Licensee/Permittee has filed an application with the FCC requesting approval to reduce its analog service prior to the transition date. If checked, indicate relevant FCC File No., proposed date reduced service would begin, proposed power level and percentage of population that would be covered by Licensee/Permittee's proposed reduced analog service.
(5) Licensee/Permittee has filed an application with the FCC requesting approval to terminate its analog service prior to the transition date. If checked, indicate relevant FCC File No. and proposed date service will cease.


SECTION VI -- DTV TRANSITION PLAN For Licensees/Permittees that are not fully constructed or operational.

Licensee/Permittee must describe in detail its plans for ceasing analog broadcasting by the June 12, 2009 transition date and for completing construction of its post-transition facility by the deadline. For example, plan must include a detailed time line of the Licensee/Permittee's plans to complete construction and any necessary testing of the Licensee/Permittee's full, authorized post-transition facility. [Exhibit 4]

SECTION VII -- ANTI-DRUG ABUSE ACT CERTIFICATION

Filer certifies that neither it nor any party to the form is subject to denial of federal benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862. Yes No

SECTION VIII -- CERTIFICATION

I certify that the statements in this application are true, complete, and correct to the best of my knowledge and belief, and are made in good faith. I acknowledge that all certifications and attached Exhibits are considered material representations. I hereby waive any claim to the use of any particular frequency as against the regulatory power of the United States because of the previous use of the same, whether by license or otherwise, and request an authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.)

Typed or Printed Name of Person Signing
JOHN E. HARRIS III
Typed or Printed Title of Person Signing
PRESIDENT & CEO
Signature
Date
02/13/2008

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1)), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503).



Exhibits
Exhibit 2
Description:
REPLACEMENT ANTENNA & TRANSMITTER

A NEW DIELECTRIC TW-9B13-R ANTENNA WAS ORDERED ON SEPTEMBER 12, 2007 TO REPLACE THE OLD BATWING TYPE CHANNEL 13 ANTENNA AND IS SCHEDULED FOR MAY, 2008 DELIVERY. ANTENNA REPLACEMENT WORK WILL BEGIN IMMEDIATELY AND INCLUDES STRUCTURAL TOWER REINFORCING WORK. ANTENNA INSTALLATION AND TESTING IS SCHEDULED FOR COMPLETION BY DECEMBER 31, 2008.

A NEW HARRIS PTCD5P1 ATSC CHANNEL 13 TRANSMITTER WAS ORDERED ON SEPTEMBER 26, 2007 AND IS SCHEDULED FOR MAY, 2008 DELIVERY. FINAL TRANSMITTER INSTALLATION AND TESTING IS SCHEDULED FOR COMPLETION BY FEBRUARY 17, 2009.


Attachment 2


Exhibit 3
Description:
ANALOG SERVICE

ANALOG SERVICE WILL CONTINUE UNTIL THE TRANSITION DATE FOR MUCH OF THE COVERAGE AREA. PHYSICAL CUTOVER TO THE NEW DIGITAL TRANSMITTER WILL RESULT IN A SCHEDULED OUTAGE FOR THE DAY PRECEDING THE TRANSITION DATE. THE NEW VHF REPLACEMENT ANTENNA HAS REDUCED GAIN THAT WILL RESULT IN A 30% REDUCTION IN ANALOG EFFECTIVE RADIATED POWER (ERP). LICENSEE SHALL FILE FOR STA APPROVAL 90 DAYS DAYS PRIOR TO SCHEDULED ANTENNA REPLACEMENT TO OPERATE AT THIS REDUCED ERP LEVEL UNTIL THE TRANSITION DATE.

Attachment 3


Exhibit 4
Description:
TRANSITION PLAN

THE FINAL TRANSITION INCLUDES REPLACEMENT OF THE VHF TOP-MOUNTED ANTENNA AND INSTALLATION OF A NEW VHF DIGITAL TRANSMITTER. THE REPLACEMENT ANTENNA IS SCHEDULED FOR MAY, 2008 DELIVERY AND INSTALLATION WILL BE COMPLETED BY DECEMBER 31, 2008. THE NEW DIGITAL TRANSMITTER HAS BEEN ORDERED AND IS SCHEDULED FOR MAY, 2008 DELIVERY. TRANSMITTER INSTALLATION AND TESTING WILL BE COMPLETED NO LATER THAN JANUARY 31, 2009 AND THE FINAL TRANSMITTER CUTOVER WILL OCCUR ON FEBRUARY 16, 2009, AT WHICH TIME ANALOG SERVICE WILL BE DISCONTINUED.

ON OCTOBER 26, 2007, PPB FILED A PETITION FOR RECONSIDERATION IN MB DOCKET NO. 87-268 PROPOSING CHANGES TO KFME-DT'S ALLOTMENT IN THE FINAL DTV TABLE OF ALLOTMENTS, AS FOLLOWS:

LATITUDE: 470045
LONGITUDE: 971141

PPB'S APPLICATION FOR A CONSTRUCTION PERMIT FOR KFME-DT'S FINAL, POST-TRANSITION DTV FACILITY WILL ALSO SEEK A FACILITY THAT DIFFERS VERY SLIGHTLY FROM KFME-DT'S ALLOTMENT IN THE FINAL DTV TABLE OF ALLOTMENTS, AS FOLLOWS:

HAAT: 342 METERS


Attachment 4