DTV TRANSITION STATUS REPORT

PLEASE READ INSTRUCTIONS BEFORE COMPLETING THIS FORM

FOR COMMISSION USE ONLY
FILE NO.

BDTRCT - 20080219AOS

NOTE: Each Licensee/Permittee is responsible for the continuing accuracy and completeness of the information furnished in this Form. Each Licensee/Permittee must update this Form, as necessary, until such Licensee/Permittee reports the completion of its transition (i.e., that it has begun operating its full, authorized facility as defined in the post-transition DTV Table, 47 C.F.R. 73.622(i), and accompanying Appendix B).

SECTION I - GENERAL INFORMATION

Licensee/Permittee Information
1. Legal Name of the Licensee/Permittee
CMCG PUERTO RICO LICENSE LLC
Mailing Address
900 LASKIN ROAD

City
VIRGINIA BEACH
State or Country (if foreign address)
VA
ZIP Code
23451 -
Telephone Number (include area code)
7574379800
E-Mail Address (if available) 
Contact Information (if different from licensee/permittee)
2. Contact Representative
ERWIN G. KRASNOW, ESQ.
Firm or Company Name

Mailing Address
1000 POTOMAC STREET, N.W.
FIFTH FLOOR

City
WASHINGTON
State or Country (if foreign address)
DC
ZIP Code
20007 -
Telephone Number (include area code)
2029657880
E-Mail Address (if available) 
EKRASNOW@GSBLAW.COM
Station / Facility Information
3. FCC Registration Number
0013990346
Call Sign 
WOST
Facility ID Number
60357
Community of License: City
MAYAGUEZ

State
PR

Network Affiliation (if applicable)
Satellite?
Yes   No
Purpose of Form:
4.
a. Status Report
b. Update     
c. Amendment
If an amendment, submit as an Exhibit a listing by Section and Question Number the portions of the pending application that are being revised. [Exhibit 1]

SECTION II - CURRENT STATUS

1.
Currently Assigned Channels:
a. NTSC Channel: 16 
b. Post-Transition DTV Channel:  22
c. Pre-Transition DTV Channel (if different from Post-Transition channel.)
2.
Relevant FCC File No. for Post-Transition Authorization, if on file with Commission (or indicate "Not Yet Filed"):
FCC File No. - Not Yet Filed
3.
Current Construction Deadline: 02/17/2009




SECTION III - POST-TRANSITION FACILITY (Complete all items unless otherwise indicated.)

1. Operational Status:
Is the Licensee/Permittee now operating its fully authorized final, DTV (post-transition) facility?
Yes No     (If YES, go to Section V; If NO, go to Item 2.)

2. If Item 1 is NO (i.e., not fully operational), then indicate operational status of final, DTV (post-transition) facility and indicate date Licensee/Permittee expects to begin full, authorized post-transition operations: (check one)
(i)
Licensee/Permittee is operating its post-transition facility pursuant to program test authority; see 47 C.F.R. § 73.1620(a). If checked, indicate date Licensee/Permittee expects to file its license to cover (FCC Form 302) application. Expected Operational Date:
(mm/dd/yyyy)
(ii)
Licensee/Permittee is operating its post-transition facility pursuant to special temporary authority (STA) or at a reduced facility. If checked, indicate power level and percentage of analog population covered by reduced facility. Power Level
 kW
Population:
 %
(iii)
Licensee/Permittee is not operating its post-transition facility.
3. Construction Status:
Has the Licensee/Permittee completed construction of its final, DTV (post-transition) facility?
Yes No     (If YES, skip Items 4-5 and go to Item 6(a); If NO, go to Item 4.)

4. If Item 3 is NO (i.e., not fully constructed), then indicate construction status of final, DTV (post-transition) facility and indicate date Licensee/Permittee expects to complete construction: (check all that apply)
(i) Licensee/Permittee has not begun construction of its post-transition facility. Expected Construction Date:
02/17/2009
(mm/dd/yyyy)
(ii) Licensee/Permittee is now constructing its post-transition facility.
(iii) Licensee/Permittee has constructed a reduced post-transition facility and additional construction is needed to complete Licensee/Permittee's fully authorized facility.
5. Construction Permit Status:
Does the Licensee/Permittee hold a license or construction permit for its final, DTV (post-transition) facility?
Yes No     (If YES, go to Item 6(a); If NO, skip Item 6(a) and go to Item 6(b).)

6.
a. Does the Licensee/Permittee need to modify its license or construction permit in order to match the post-transition facilities defined for the Licensee/Permittee in the new DTV Table of Allotments, 47 C.F.R. § 73.622(i), as adopted in the Seventh Report and Order in MB Docket No. 87-268?
Yes No     (If YES, go to 6(b); If NO, skip Item 6(b) and go to Section IV.)

b. Has the Licensee/Permittee filed an application for a new or modified construction permit for its final, DTV (post-transition) facility? (If YES, indicate relevant FCC File No. and date filed; If NO, indicate date Licensee/Permittee expects to file such application.) (NOTE: To qualify for expedited processing, the Licensee/Permittee must file its application within 45 days of the effective date of the Report and Order in the Third DTV Periodic Review proceeding, MB Docket No. 07-91, as well as meet other criteria established in that proceeding.)
Yes
FCC File No.
- Filing Date: (mm/dd/yyyy)
No
Expected Filing Date:
03/01/2008 (mm/dd/yyyy)

SECTION IV -- ADDITIONAL STEPS NEEDED TO COMPLETE CONSTRUCTION (For Licensees/Permittees that are not fully constructed or operational.)

At present, Licensee/Permittee has the following needs that must be addressed before it can fully construct and/or operate its final, DTV (post-transition) facility: (check all that apply and for all checked responses, describe issue and estimate date of resolution. If necessary, provide an explanation or attach an Exhibit). [Exhibit 2]
(1) Licensee/Permittee needs to obtain FCC action on a pending application. (If checked, indicate date filed and relevant FCC File No.)
FCC File No. -

Date filed: (mm/dd/yyyy)

(2) Licensee/Permittee needs to obtain international government clearance for its post-transition facility.
(3) Licensee/Permittee needs to obtain FAA approval for its post-transition facility.
(4) Licensee/Permittee needs to obtain state or local governmental approval (e.g., zoning) for its post-transition facility.
(5) Licensee/Permittee needs to obtain, adjust and/or install equipment for its post-transition facility. (If checked, specify need below and indicate when equipment was ordered and expected delivery date.)
(1) New antenna.
(2) Adjust or install antenna (except for side-mount issue).
(3) Switch side-mounted DTV antenna with top-mounted analog antenna.
(4) New transmitter.
(5) Adjust or install transmitter.
(6) General installation of equipment requiring hiring of a tower crew.
(7) Other equipment needs. (If checked, specify.)
(6)
Licensee/Permittee needs to change its tower location or construct a new tower.
(7) Licensee/Permittee needs to coordinate its transition with other broadcast stations. (If checked, specify Call Signs of those other stations.)
(8) Licensee/Permittee has other needs that must be addressed before it can fully construct and operate its post-transition facility. (If checked, explain.)

SECTION V -- ANALOG SERVICE

Status of Analog Service. (Check one.) If necessary, provide an explanation or attach an Exhibit. Note: Full-power television broadcast stations must cease broadcasting in analog as of the transition date (i.e., June 12, 2009), as required by statute; see 47 U.S.C. § 309(j)(14). [Exhibit 3]
(1) Licensee/Permittee will continue to provide full, authorized analog service until the transition date.
(2) Licensee/Permittee has obtained FCC approval to reduce its analog service prior to the transition date. If checked, indicate relevant FCC File No., date reduced service will begin, power level and percentage of population covered by Licensee/Permittee's analog service.
(3) Licensee/Permittee has obtained FCC approval to terminate its analog service prior to the transition date. If checked, indicate relevant FCC File No. and date service will cease.
(4) Licensee/Permittee has filed an application with the FCC requesting approval to reduce its analog service prior to the transition date. If checked, indicate relevant FCC File No., proposed date reduced service would begin, proposed power level and percentage of population that would be covered by Licensee/Permittee's proposed reduced analog service.
(5) Licensee/Permittee has filed an application with the FCC requesting approval to terminate its analog service prior to the transition date. If checked, indicate relevant FCC File No. and proposed date service will cease.


SECTION VI -- DTV TRANSITION PLAN For Licensees/Permittees that are not fully constructed or operational.

Licensee/Permittee must describe in detail its plans for ceasing analog broadcasting by the June 12, 2009 transition date and for completing construction of its post-transition facility by the deadline. For example, plan must include a detailed time line of the Licensee/Permittee's plans to complete construction and any necessary testing of the Licensee/Permittee's full, authorized post-transition facility. [Exhibit 4]

SECTION VII -- ANTI-DRUG ABUSE ACT CERTIFICATION

Filer certifies that neither it nor any party to the form is subject to denial of federal benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862. Yes No

SECTION VIII -- CERTIFICATION

I certify that the statements in this application are true, complete, and correct to the best of my knowledge and belief, and are made in good faith. I acknowledge that all certifications and attached Exhibits are considered material representations. I hereby waive any claim to the use of any particular frequency as against the regulatory power of the United States because of the previous use of the same, whether by license or otherwise, and request an authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.)

Typed or Printed Name of Person Signing
DAVID J. WILHELM
Typed or Printed Title of Person Signing
ASSISTANT SECRETARY
Signature
Date
02/19/2008

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1)), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503).



Exhibits
Exhibit 2
Description:
ADDITIONAL STEPS

WOST, MAYAGUEZ, PUERTO RICO, REQUIRES A NEW DTV TRANSMITTER AND ANTENNA FOR POST-TRANSITION DTV OPERATION. CMCG PUERTO RICO LICENSE LLC ('CMCG'), LICENSEE OF WOST, ANTICIPATES THAT THE NEW ANTENNA WILL BE ORDERED ON MARCH 1, 2008 AND WILL BE DELIVERED BY DECEMBER 31, 2008.    CMCG HAS OBTAINED A TOWER CREW TO INSTALL THE ANTENNA, WITH INSTALLATION SCHEDULED FOR FEBRUARY 13-17, 2009. CMCG EXPECTS TO ORDER THE NEW DTV TRANSMITTER FOR WOST ON OR NEAR APRIL 15, 2008 (AT THE NAB TRADE SHOW). THE DELIVERY OF THE NEW TRANSMITTER IS ESTIMATED FOR AUGUST 15, 2008. INSTALLATION OF THE TRANSMITTER IS EXPECTED TO BE COMPLETED BY SEPTEMBER 15, 2008.

WOST MUST COORDINATE ITS TRANSITION WITH TELEVICENTRO OF PUERTO RICO, LLC, LICENSEE OF WNJX-TV, MAYAGUEZ, PUERTO RICO. WNJX-TV IS CURRENTLY OPERATING ON CHANNEL 22, WOST'S POST-TRANSITION CHANNEL.

Attachment 2


Exhibit 3
Description:
ANALOG SERVICE

CMCG ANTICIPATES THAT WOST WILL TERMINATE ITS ANALOG SERVICE PRIOR TO THE FEBRUARY 17, 2009 TRANSITION DEADLINE IN ORDER TO MAKE THE FINAL INSTALLATION OF THE WOST DTV ANTENNA FOR POST-TRANSITION OPERATION. WOST WILL PROVIDE THE COMMISSION AND THE PUBLIC WITH NOTIFICATION OF THIS TERMINATION PURSUANT TO 47 CFR 73.1615 AND/OR THE THIRD PERIODIC REVIEW OF THE COMMISSIONS RULES AND POLICIES AFFECTING THE CONVERSION TO DIGITAL TELEVISION, REPORT AND ORDER, FCC 07-228 (REL. DEC. 31, 2007), AS APPLICABLE.

Attachment 3


Exhibit 4
Description:
DTV TRANSITION PLAN

WOST MUST REPLACE ITS EXISTING NTSC TRANSMITTER AND ANTENNA FOR CONSTRUCTION AND OPERATION OF THE WOST POST-TRANSITION DTV FACILITY. THE EXHIBIT ATTACHED HERETO CONTAINS A LIST OF ALL EQUIPMENT NECESSARY FOR THE CONSTRUCTION OF WOST'S POST-TRANSITION FACILITY AND A DETAILED CONSTRUCTION TIMELINE. THE DATES PROVIDED THEREIN ARE ESTIMATES BASED ON CURRENT INFORMATION AND ARE SUBJECT TO CHANGE. CMCG ANTICIPATES THAT IT WILL FILE A DTV CONSTRUCTION PERMIT APPLICATION FOR WOST'S POST-TRANSITION FACILITY BY MARCH 1, 2008, AND WILL COMMENCE CONSTRUCTION OF THE WOST DTV FACILITY AS SOON AS PRACTICABLE AFTER THE COMMISSION HAS GRANTED WOST'S DTV CONSTRUCTION PERMIT APPLICATION.

CMCG WILL UPDATE THIS DTV STATUS REPORT, AS NECESSARY, TO ENSURE THAT THE INFORMATION CONTAINED HEREIN REMAINS SUBSTANTIALLY ACCURATE.


Attachment 4
Description
Construction Chart